I was in Mount Logmore, I had a Bison, medium log cart and a Skidder. What I didn't have, was a crane. So the log cart was to tall for the skidder to load it, so I had a thought. What if I disconnect the trailer from the Bison, flip the trailer on it's side, load the logs with the skidder then right the trailer, reconnect it to the Bison, and load the logs.
So I tried it, and while not the fastest process, plus I'm still a bit inexperienced with the skidder, to my surprise this actually ended up working out.
So what about you guys. Has anybody else got any thinking outside the box ideas that actually ended up panning out?