[PTS 30.1] House models do not change to built in Everybody Gets A Log contract

Good day.

KSIVA: p:3cd88

Upon completion of the second stage of Everybody Gets A Log contract on Oviro Hills, North Carolina, the house model remains unbuilt, as opposed to the first stage and the first house being built immediately.

Screenshot: https://imgur.com/ewDadAt.png

last edited by McKillem

Completed the contract. First house:
SnowRunner __  KSIVA_ p_452fd 21.12.2023 20_44_05.png

Second house:
SnowRunner __  KSIVA_ p_452fd 21.12.2023 20_44_22.png

Third house:
SnowRunner __  KSIVA_ p_452fd 21.12.2023 20_44_38.png

Regression: as of PTS 30.1 now first two out of three houses in the contract get reverted to the unbuilt state:

SnowRunner __ 12.04.2024 20_29_20.png
SnowRunner __ 12.04.2024 20_35_23.png
SnowRunner __ 12.04.2024 20_37_28.png